Resource Tardiness Weighted Cost Minimization in Project Scheduling

Author

Shirzadeh Chaleshtarti, A.

Source

Advances in Operations Research

Issue

Vol. 2017, Issue 2017 (31 Dec. 2017), pp.1-11, 11 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2017-01-10

Country of Publication

Egypt

No. of Pages

11

Main Subjects

Information Technology and Computer Science

Abstract EN

In this paper, we study a project scheduling problem that is called resource constrained project scheduling problem under minimization of total weighted resource tardiness penalty cost (RCPSP-TWRTPC).

In this problem, the project is subject to renewable resources, each renewable resource is available for limited time periods during the project life cycle, and keeping the resource for each extra period results in some tardiness penalty cost.

We introduce a branch and bound algorithm to solve the problem exactly and use several bounding, fathoming, and dominance rules in our algorithm to shorten the enumeration process.

We point out parameters affecting the RCPSP-TWRTPC degree of difficulty, generate extensive sets of sample instances for the problem, and perform comprehensive experimental analysis using the customized algorithm and also CPLEX solver.

We analyze the algorithm behavior with respect to the changes in instances degree of difficulty and compare its performance for different cases with the CPLEX solver.

The results reveal algorithm efficiency.

American Psychological Association (APA)

Shirzadeh Chaleshtarti, A.. 2017. Resource Tardiness Weighted Cost Minimization in Project Scheduling. Advances in Operations Research،Vol. 2017, no. 2017, pp.1-11.
https://search.emarefa.net/detail/BIM-1125212

Modern Language Association (MLA)

Shirzadeh Chaleshtarti, A.. Resource Tardiness Weighted Cost Minimization in Project Scheduling. Advances in Operations Research No. 2017 (2017), pp.1-11.
https://search.emarefa.net/detail/BIM-1125212

American Medical Association (AMA)

Shirzadeh Chaleshtarti, A.. Resource Tardiness Weighted Cost Minimization in Project Scheduling. Advances in Operations Research. 2017. Vol. 2017, no. 2017, pp.1-11.
https://search.emarefa.net/detail/BIM-1125212

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1125212