Analysis of the Earned Value Management and Earned Schedule Techniques in Complex Hydroelectric Power Production Projects: Cost and Time Forecast

Joint Authors

Sebastian, Miguel A.
Urgilés, P.
Claver, J.

Source

Complexity

Issue

Vol. 2019, Issue 2019 (31 Dec. 2019), pp.1-11, 11 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2019-04-01

Country of Publication

Egypt

No. of Pages

11

Main Subjects

Philosophy

Abstract EN

All projects take place within a context of uncertainty.

That is especially noticeable in complex hydroelectric power generation projects, which are affected by factors such as the large number of multidisciplinary tasks to be performed in parallel, long execution times, or the risks inherent in various fields like geology, hydrology, and structural, electrical, and mechanical engineering, among others.

Such factors often lead to cost overruns and delays in projects of this type.

This paper analyzes the efficiency of the Earned Value Management technique and its Earned Schedule extension, as means of forecasting costs and deadlines when applied to complex hydroelectric power production projects.

It is worth noting that this analysis was based on simulation models applied to real-life projects.

The results showed that cost forecasting becomes very accurate over time, whereas duration forecasting is not reliably accurate.

American Psychological Association (APA)

Urgilés, P.& Claver, J.& Sebastian, Miguel A.. 2019. Analysis of the Earned Value Management and Earned Schedule Techniques in Complex Hydroelectric Power Production Projects: Cost and Time Forecast. Complexity،Vol. 2019, no. 2019, pp.1-11.
https://search.emarefa.net/detail/BIM-1131351

Modern Language Association (MLA)

Urgilés, P.…[et al.]. Analysis of the Earned Value Management and Earned Schedule Techniques in Complex Hydroelectric Power Production Projects: Cost and Time Forecast. Complexity No. 2019 (2019), pp.1-11.
https://search.emarefa.net/detail/BIM-1131351

American Medical Association (AMA)

Urgilés, P.& Claver, J.& Sebastian, Miguel A.. Analysis of the Earned Value Management and Earned Schedule Techniques in Complex Hydroelectric Power Production Projects: Cost and Time Forecast. Complexity. 2019. Vol. 2019, no. 2019, pp.1-11.
https://search.emarefa.net/detail/BIM-1131351

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1131351