Extension of IFC schema in construction delay claims

Joint Authors

al-Said, Muhib
Hammam, Akram. M

Source

Journal of al Azhar University : Engineering Sector

Issue

Vol. 13, Issue 48 (31 Jul. 2018), pp.908-919, 12 p.

Publisher

al-Azhar University Faculty of Engineering

Publication Date

2018-07-31

Country of Publication

Egypt

No. of Pages

12

Main Subjects

Civil Engineering

Abstract EN

Despite the widespread implementation of Building Information Modelling (BIM) in Construction and Facilities Management, limited researches are conducted on forensic delay claims.

As witnessed from several construction disputes and court cases, forensic delay claims are known to be the most complex types of claims, in which Claimants incur significant losses due to their failure to substantiate.

Despite the availability of modern document control system, forensic delay claims require extensive research to assimilate event related contemporaneous project records within a limited time.

This paper addresses the research gap of the application of BIM technology in the assessment of forensic claims.

It proposes a new mechanism of extending the non-proprietary Industry Foundation (IFC) Schema by dynamic property sets to integrate BIM objects with claim related attributes such as delay events and float paths and their respective project documents.

The proposed methodology enhances the overall efficiency of the forensic claim process enabling the retrieval of all spatial related project documents pertaining to a specified delay event.

This allows the performance of what-if scenarios for the optimum selection and substantiation of a delay claim

American Psychological Association (APA)

Hammam, Akram. M& al-Said, Muhib. 2018. Extension of IFC schema in construction delay claims. Journal of al Azhar University : Engineering Sector،Vol. 13, no. 48, pp.908-919.
https://search.emarefa.net/detail/BIM-920363

Modern Language Association (MLA)

Hammam, Akram. M& al-Said, Muhib. Extension of IFC schema in construction delay claims. Journal of al Azhar University : Engineering Sector Vol. 13, no. 48 (Jul. 2018), pp.908-919.
https://search.emarefa.net/detail/BIM-920363

American Medical Association (AMA)

Hammam, Akram. M& al-Said, Muhib. Extension of IFC schema in construction delay claims. Journal of al Azhar University : Engineering Sector. 2018. Vol. 13, no. 48, pp.908-919.
https://search.emarefa.net/detail/BIM-920363

Data Type

Journal Articles

Language

English

Record ID

BIM-920363